Step 1
Structural design and fabricator selection
Structural steel projects start with the structural engineer's design and the selection of a fabricator whose shop drawing and delivery timelines support the project schedule. For Garland projects, we engage fabricators early in the design process so shop drawing submittal, review, and approval can occur before the permit is in hand — reducing the gap between permit issuance and steel delivery.
